View our current and completed projects that include mechanical installation, class one welding, gas, plumbing, and commercial plant installs.
Heating and chilled prefabricated energy centre and distribution.
Fully delivered and installed.



CAD drawings




This project consists of 198 apartments over 3 plots/buildings. These includes one, two and three bedrooms, assisted living and a community centre.
We are currently providing the mechanical installation on this project in the following areas:

Please Note: In keeping with client confidentially agreements photos and locations are unable to be disclosed.
Work has been successfully completed within multiple military barracks.
Works we have carried out consists of the following:
Our team have been fully vetted and have cleared all security checks to carry out works on
high security sites.

This project is an extension to the school

This project is an extension top existing college

We are currently providing the mechanical installation on this project in the following areas:

We providing the mechanical installation on this project in the following areas:









A bank of 47 gas mains leaving the meter room and penetrating the far wall before going up the service riser to feed 4 floors of apartments








Installation of AHU's with LTHW and chilled coils prior to insulation

Commercial indirect hot water cylinder

Commercial heating system install with 3 variable temperature circuits

CWS booster pump and tank

Central heating boiler plantroom

Two large plate heat exchangers installed on a plant replacement feeding an old system, used to separate old system from new

Installation of low loss header feeding two circuits constant temperature

Small booster plant room installation complete with tank